If the actual information at the lifting site does not tally with the lifting plan, you should stop the operation until the plan has been updated and re-approved.You should never deviate or vary from the approved lifting plan.Sketch of the lifting zone (showing position of lifting equipment, crew and load) and.Requirements to erect or dismantle lifting equipment (if any).However, previous planning approaches are still impractical because the. Lifting crew (including their roles and competencies) Tower crane lift planning is important to timely provide resources to workplaces.Your lifting plan should include, but not limited to, the following elements: load capacity chart, range diagram, rigging method)įor complex lifts, additional engineering design efforts are necessary to ensure that the lifting operation is conducted safely. Safe work procedure or method statement. Lifting plan supported by a risk assessment (RA).For example, a lifting plan would ensure that the crane is safely deployed and operated, and the lifting crew are clear about their roles and responsibilities.īefore you start any lifting operation, you must prepare the following: This lifting plan sample also provides calculation for sling tension. A lifting plan provides a systematic approach towards planning a lift and ensures that the lifting operation is properly managed. A relatively routine, simple basic lift is normally one which because of weight, length or physical size requires two cranes e.g. Find below safe work lifting plan template for use in crane lifting process.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |